2002 Progress
|

|
|

|

|


Progress to extend the mainline is under way on the SWSF. On June 9th, less than 24 hours after the last operating session ended, construction began. The goals are:
- to have fully operational the town of Redding, which up until now had been acting as the end of the line with temporary track installed
- to have the mainline and a passing siding operational in the town of Douglas (above the roundhouse area on the lower level)
- to have the mainline and a passing siding operational in the town of Raymond (at the end of the Los Molinos/Red Bluff/Kingsley aisle)
- to have at least 10 temporary staging tracks operational, all of them longer than the previous temporary tracks. They will be installed along the long side wall above Red Bluff, and configured as two staging yards, one after the other, with a single through track passing through the first in order to reach the yard behind it. This will require lenghtening the "aircraft carrier" so it can be used again.
Click on a construction image below to go to that week's update page.

January, 2003 Update


December 12, 2002 Update


October 22, 2002 Update


August 30, 2002 Update


August 9, 2002 Update


July 27, 2002 Update


July 13, 2002 Update


June 29, 2002 Update


June 22, 2002 Update


June 16, 2002 Update


June 9, 2002 Update

|

|
|